Lang abstract a simpler solution which greatly reduces the time necessary to compute the specific yield by the pumpingtest method of remson and lang 1955 is presented. Repeat this procedure for all other outside faucets. Apply the test pressure in increments of 25 psi, or as directed by the. The well yield test for alluvial sediments shall be conducted using one of. Upon a third positive bacteria sample, contact a well professional to thoroughly evaluate the condition of the well. The centrifugal pump performance test procedure is carried out as follows, but it may slightly change based on pump vendor test bed condition and internal procedures. Preparing a policy or procedure document for uc santa cruz infoslug online policy and procedure system is not as mysterious or difficult as you might think. Weilfelix test is based on crossreactions that occur between antibodies produced in acute rickettsial infections with antigens of ox ox 19, ox 2, and oxk strains of proteus species. The test is combined and conducted continuously in a series. To perform a well test successfully one must be able to measure the time, the rate, the pressure, and control the rate.
What is well testing well test support and elearning. To understand this important discipline, well testing experts have developed definitions ranging from average reservoir pressure to dst and well interference testing. This procedure is valid after the appropriate steps have been taken to assure that the well has been properly developed. During a well test, a transient pressure response is created by a temporary change in production rate. Jun 04, 2017 the date of the test is helpful, as testing records are most useful when looking at the behavior of a well over time. The sketch at page top, courtesy of carson dunlop associates, outlines what happens during a true well flow test, also called a well drawdown or well flow test procedure. The type of test, the condition of the well, and the length of the test are. The below figure shows a basic centrifugal pump test circuit. This procedure outlines the necessary actions and safety practices for pressure testing all new fuel line piping and other piping air tests at mcmurdo. Millions of grid blocks around the well capture the. The test flow rate and drawdown, or buildup durations are designed according to the test objectives.
Its disadvantages are the accuracy in determining of the. Lang abstract a simpler solution which greatly reduces the time necessary to compute the specific yield by the pumping test method of remson and lang 1955 is presented. A well yield test is a short approximately one hour flow test, usually done by a qualified well driller once the well is completed to provide a rough estimate of the wells yield. This guide is designed to explain the campus policy and procedure framework, to help policy and procedure owners organize their written documentation, and to act as a resource. Go to well testing, results, and options for more information on how to test your well water and what to do with your test results. Well testing is widely used today in water wells, oil and gas wells. Accredited labs in minnesota accepting samples from private well owners pdf.
It is possible to add several pressure responses, and therefore to describe the well behavior after any rate change. This may require nabors to incur the cost for the testing subcontractor as well as provide rig time to the operator for the test. This data is also used to calculate bottomhole pressures 3. This is the superposition principle van everdingen and hurst, 1949. The near wellbore region is accurately modelled using tartan grids. That procedure can give an accurate picture of how much water the well can deliver, though the quantity may vary seasonally or.
Well test objectives are classified in the following three major areas. General elisa procedure unless you are using a kit with a plate that is precoated with antibody, an elisa begins with a coating step, in which the first layer, consisting of a target antigen or antibody, is adsorbed onto a 96 well polystyrene plate. This pre test will function as a step drawdown test, where the sustained pump rate may be determined prior to the day of the pump test. This pretest will function as a step drawdown test, where the sustained pump rate may be determined prior to the day of the pump test. Agip division organising department type of activity issuing dept. Description of a well test dd i bu p p pt p pt p t. It is essential that the various aquifers and boundaries in heterogeneous settings be identified and that the various water surfaces existing at the site be located. The diffusivity equation used to generate the well test analysis solutions is linear. Step sub procedure remarks bop pressure testing procedure 1 discuss operator bop requirements with rig manager. The test consisted of an injecting pts survey, an injectivity test, and a pressure falloff test. Applying petroleum the pressure buildup well test procedure on. Figure 3typical scale on the megger insulation tester.
Allow the chlorinated water to stand in the well and the. That procedure can give an accurate picture of how much water the well can deliver, though the quantity may vary seasonally or for other reasons. The data monitored includes pressures, temperatures and flow rates recorded at multiple locations on the well test package. Information gained from well test by measuring flow rates at surface and pressure with a downhole gauge, a well test provides information on well productivity and reservoir performance over a large scale of investigation skin, permeability, connected volume, reservoir pressure. The objective is to provide an easy to read introduction to classical well test. Guide to conducting pumping tests british columbia. Improper test methods, poor well construction, and improper isolation can significantly impact any test design. A simple method for determining specific yield from pumping tests. A pumping test is a practical method of estimating well performance, well capacity, the zone of influence of the well and aquifer characteristics e.
Construct a semilogarithmic plot showing a 180day projection of the timedrawdown curve. An example of a well test interpretation procedure horner analysis, see page 38 used to estimate the permeability of the for mation is shown. Reverse side of card at right is used to record the test data. The method is based on a premise of analogy between trt and petroleum well testing, since the origin of both procedures lies in the diffusivity.
Water level in the test well must remain above the intake plus a margin of 5% but no less than 5 feet of the pretest water column, or. An introduction to well drawdown several key terms associated with well drawdown are listed below. Procedure for well test this test is a pressure drawdown test of a. General elisa procedure unless you are using a kit with a plate that is precoated with antibody, an elisa begins with a coating step, in which the first layer, consisting of a target antigen or antibody, is adsorbed onto a 96well polystyrene plate. Well 2yield tests are done using bailing1 or air lifting methods. Shutin the well decreasing the bottom hole pressure interference test pulse test producing well measure pressure in another shutin well away from the producer communication test gas well test back pressure, isochronal test, modified isochronal test well productivity, aofp, non darcian skin. In that npshr test is usually carried out whenever the npsh margin is. Most well tests consist of changing the rate, and observing the change in pressure caused by this change in rate. Introductory well testing 9 preface 1 preface while there are many excellent and important books on the subject of well testing, few provide an introduction to the topic at the very basic level. Static level static level is the level of water in a well when no water is being taken from the well by pumps it is usually expressed as the distance in feet or meters from the ground surface to the water level. Well test analysis for wells produced at a constant.
Injection pts survey a completion test at awi 87 was conducted 40 days after drilling completion, before the stimulation. Well test systems are the facilities installed on vessels or mobile offshore drilling units modus for the purpose of evaluating the quality andor quantity of the fluid to determine whewell ther the well should be completed for production or plugged and abandoned. The primary function of surface well test equipment is to provide a safe and efficient system to separate hydrocarbon phases, to measure and collect accurate well data and importantly, to collect representative fluid samples. The dst or drill stem test used in both oil and gas wells, in cased or uncased wells. A pumping test is a field experiment in which a well is pumped at a controlled rate and waterlevel response is measured in one or more surrounding observation wells and optionally in the pumped well control well itself. To understand this important discipline, welltesting experts have developed definitions ranging from average reservoir pressure to dst and wellinterference testing. Figure 4typical record of insulation resistance of a mill motor. This is followed by a blocking step in which all unbound sites are coated with a blocking agent. Curve b shows same values corrected to 20c see page 22, giving a definite downward trend toward an unsafe condition. The objective is to provide an easy to read introduction to classical well test theory. It is generally recorded in the well construction report by the driller. A simple pump specific capacity test involves the pumping of a single well with no associated observation wells.
A simple method for determining specific yield from. The well yield test for alluvial sediments shall be conducted using one of the following methods. Well flow test, well yield test, well draw down test. For a buildup after a single drawdown period at rate q during t p. Insure that all romfors bop equipment is tested consistent with romfors policy. The single phased horizontal well is modelled using a light oil simulator. Very, very common test so learn about them used to determine formation permeability boundary conditions. Basic concepts in well testing for reservoir description. While most private water wells in wisconsin provide safe drinking water, some may become contaminated with bacteria and other contaminants that are not filtered out when the water soaks into the ground.
Make sure youre serving your family safe drinking water. Prior to the start of the well yield test, a standing static water level measurement shall be taken. Pumping test procedures for water withdrawal applications. Centrifugal pump performance test procedure mechanical. Well test interpretation depends on mathematical models. Surface well test cleanup well testing schlumberger. The complete guide to electrical insulation testing. The purpose of a pump test is to obtain information on well yield, observed drawdown, pump efficiency, and calculated specific capacity. Best bet for getting help with water contaminationor water tests, treatments, cures. A simple method for determining specific yield from pumping tests by l. Pneumatic tests are potentially more dangerous than hydrostatic because of the higher level of potential energy. The date of the test is helpful, as testing records are most useful when looking at the behavior of a well over time. Surface well testing is the only technique available today that assesses the true reservoir potential at full scale under dynamic conditions.
Continue the test period until stabilization occurs, or ii. Dec 31, 2016 this procedure outlines the necessary actions and safety practices for pressure testing all new fuel line piping and other piping air tests at mcmurdo. Pdf well testing by sinusoidal stimulation researchgate. The procedure includes the requirement that the well will be ready for the test upon arrival of the kdhe witness to eliminate unnecessary delays or unsuccessful trips. The book presents the use of oil well testing techniques and analysis methods for the evaluation of well conditions and reservoir characteristics. Various types of surface pressure tests usually for gas wells. Water level in the test well must remain above the intake plus a margin of 5% but no less than 5 feet of the pre test water column, or. Static level static level is the level of water in a well when no water is being taken from the well by pumps it is usually expressed as the distance in feet or. The reader is expected to understand basic concepts of flow in porous media. It validates well performance during cleanup and commissioning and provides reservoir monitoring for better field management. Pneumatic tests may be performed only when at least one of the following conditions exists. Procedure for shock chlorination of water systems using. Weilfelix is a nonspecific agglutination test that detects antirickettsial antibodies in patients serum.
257 1392 1146 241 31 16 822 986 1280 1175 1088 94 405 34 583 852 244 157 1017 363 579 573 117 396 332 765 845 537 1416 1261 1027 691 383 170 1296